Gold Standard Drilling and Exploration Update

Gold Standard Ventures (OTCQX: GDVXF; TSX-V: GV) provides an exploration update on Railroad and East Camp Douglas projects in Nevada.  At the Company’s flagship Railroad property in the Carlin trend, three core rigs and one RC rig continue drilling.  Progress is good considering the conditions and all three holes are angled into the recently identified north-south-trending target zone testing for high-grade structures which would have fed the broader North Bullion Fault Zone target area. 

At East Camp Douglas, a 30 hole notice of intent has been approved by the BLM.  One core rig is being set up now and additional rigs will be added upon completion at Railroad.  Company geologists have designed an initial 10 to 12 hole core drilling program, totalling about 10,000 feet, operating through May of this year. No core drilling has ever been conducted on this property, only shallow RC holes, the latter of which intersected 55 feet of 0.51 opt gold from 30 feet to 85 feet down the hole.

Read More

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: