Constantine Reports Final Drill Results at Munro-Croesus Gold Project, Ontario

Constantine Metal Resources Ltd. (OTC Other: CNSNF and TSX-V: CEM) announced today the final round of results, with several new high-grade gold intersections, from the 100% owned Munro-Croesus Gold Project drill program located 75 kilometers east of Timmins, Ontario. The 7280 meter drill program tested the Croesus Mine target at shallow and moderate depths, and the Four Corners property at the Canamax and Perry Pond targets.

In the release Garfield MacVeigh, President and CEO of the Company stated: “The 2011 Munro Croesus drill program has documented significant gold mineralization in multiple different areas of the greater Munro Croesus project. Combined with the potential for extensions of Lake Shore Gold’s Fenn-Gib deposit (acquired from Barrick for $60 million) immediately along strike onto Constantine ground, the project area offers a great opportunity to build shareholder value.”

Read More

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: