Gold Bullion Development Drills 1.36g/t Over 80 Metres

Gold Bullion Development (OTC Other: GBBFF; TSX-V: GBB) has completed 24,000 metres of a planned 50,000 metre Phase 3 drill program at the Company’s Granada property in Quebec.  The continually expanding mineralized area remains open in all directions and to depth.  Highlights from the most recent assay results include the following,

  • Hole GR-10-108 – 74.44 metres grading 1.06 grams per tonne, including 2.00 metres grading 16.75 grams per tonne;
  • Hole GR-10-173 – 80.00 metres grading 1.36 grams per tonne, including 1.00 metre grading 89.83 grams per tonne; and
  • Hole GR-11-200 – 106.00 metres grading 0.81 grams per tonne, including 1.50 metres grading 42.90 grams per tonne.

Mineralization of the above three holes is within 7 metres from surface vertical. Drilling at the Granada property continues with 2 drill rigs on 24 hours a day 7 days a week schedule. The present mineralized zone now covers an area of 1.2 kilometres along strike and is up to 0.5 kilometres wide.

Read More

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: